Dundalk Institute of Technology

STEM Building, Fabric Upgrade Projects and Digital Incubation Centre Extension

Dundalk Institute of Technology is investing in a significant repositioning of its educational offering and as part of that strategic process is investing in the upgrade of its existing facilities and also investing in new modern teaching facilities.

1300

m2

STEM Extension including Laboratories, Clean Room, Teaching and Administration Facilities

1300

m2

Digital Incubation Centre extension to existing Regional Development Centre to provide start up and collaboration spaces

10500

m2

And upgrade of fabric to existing 10500sqm North Building Complex

2500

m2

And upgrade of fabric to existing 2500sqm South Building Complex

Project story

STATEMENT

DKIT as part of their strategic plan are focussed on enhancing their existing STEM teaching spaces and also upgrading their existing building stock to improve the energy performance of these buildings.

The new facilities encompass a circa 1300sqm STEM Building which includes research and teaching laboratories and associated spaces which are linked to the existing teaching and lecture spaces and a new circa 1300sqm extension to the Regional Development Centre (RDC) which will focus on providing Incubation and Co-Working spaces for post graduate and new start-up companies with a particular focus on the digital heathcare sector.

The third aspect of the strategic plan is to upgrade the existing facilities which includes upgrade of the fabric of the North and South Building together with upgrade of 15 No laboratories within the existing buildings on a phased basis.

An Enabling Works project was completed in late 2020, the STEM Building has been procured and is due for completion in early 2023 and the the Fabric Upgrade projects will be completed on a phased basis over the next few years; The Digital Incubation Centre Extension to RDC project achieved planning in Q3 2021 and is on hold following a procurement process due to funding challenges.

Works are being procured in accordance with the CWMF requirements with the Reserved Specialist Procurement Route being implemented on some schemes within the overall programme for works.

  1. STEM Building Extension with High Tech Laboratories, Clean Rooms and Teaching Spaces
  2. Digital Incubation Centre Extension with start-up and collaboration spaces in a flexible building layout
  3. Phased Refurbishment and upgrade of fabric to existing building stock comprising close on 14,000sqm footprint

KEY FACTS

Client Name: Dundalk Institute of Technology

Project Value: €25m+

Architect: Scott Tallon Walker

Our Role: Cost Management

C&S: WS Atkins

Services: Delap & Waller

Dundalk Institute of Technology

DkIT is the focal point for higher education and research on the Belfast-Dublin corridor, serving the North Leinster, South Ulster region of Ireland.

FEATURED PROJECTS

We are changing the world for the better. One space at a time. Take a glimpse at our projects and discover how we’re radically transforming the blueprint for design and construction.

Industrial

624 Northwest Business Park

Republic of Ireland

Value: €30m
Hospitality & Leisure

Arran Street Hotel Development

Republic of Ireland

Value: €38m
Residential

European Parliament Liaison Office Development

Republic of Ireland

Value: €18m